seinstoring

Signal failure: Groningen-Leeuwarden (8 March 2019)

  1. Disruption resolved Last update

    Between Groningen and Zuidhorn the restrictions are resolved.

    Train measures

    • Sneltrein 37300 Leeuwarden - Groningen is cancelled between Groningen and Buitenpost
    • Stoptrein 37400 Leeuwarden - Groningen is cancelled between Groningen and Zuidhorn
  2. Show complete timeline…
  3. Disruption reported

    Between Groningen and Zuidhorn there are delays due to a signal failure.
    The extra travel time is about 15 minutes.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Groningen and Zuidhorn.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 2:24 PM on March 8, 2019 and took 1 hour, 47 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights