Disruption cause: signal failure

This page shows more information about this disruption cause.

This disruption cause has been categorized under Infrastructure.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Arnhem Centraal - Winterswijk
    43 disruptions • duration: 3 days, 4 hours
  2. Breda - Dordrecht
    38 disruptions • duration: 3 days, 15 hours
  3. Groningen - Leeuwarden
    35 disruptions • duration: 3 days, 9 hours
  4. Nijmegen - Venlo
    32 disruptions • duration: 5 days
  5. Emmen - Zwolle
    31 disruptions • duration: 1 day, 19 hours

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between May 1, 2018 and April 30, 2020, Rijden de Treinen has reported 834 disruptions caused due to a signal failure. This is an average of 1 disruption per day.

The average duration for this cause is 2 hours, 12 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to a signal failure and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.