defecte bovenleiding

Damaged overhead wires: Eindhoven-Weert (19 January 2018)

  1. Disruption resolved Last update

    Between Eindhoven and Weert the train traffic is fully resumed.

    Advice

    Local buses are still running between Eindhoven, Geldrop, Heeze, Maarheeze and Weert.
    Express buses are still running between Eindhoven and Weert.

  2. Show complete timeline…
  3. Disruption reported

    Between Eindhoven and Geldrop no trains are running due to damaged overhead wires.
    It is not known yet how long this will take.

    Train measures

    • Intercity 800 Alkmaar - Utrecht C. - Eindhoven - Maastricht is cancelled between Weert and Roermond
    • Intercity 3500 Schiphol Airport - Utrecht C. - Eindhoven - Venlo is cancelled between Weert and Sittard

Location of this disruption

This disruption is between Eindhoven and Weert.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 6:46 AM on January 19, 2018 and took 12 hours, 13 minutes in total.

For statistics, this disruption is caused due to damaged overhead wires.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights