Disruption cause: signal and level crossing failure

This page shows more information about this disruption cause.

This disruption cause has been categorized under Infrastructure.


Statistics

Statistics for this cause are calculated over the past 24 months.

Between April 1, 2022 and March 31, 2024, Rijden de Treinen has reported 55 disruptions caused due to a signal and level crossing failure. On average 0 disruptions per day.
The average duration for this cause is 2 hours, 38 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to a signal and level crossing failure and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.