sein- en overwegstoring

Signal and level crossing failure: Lage Zwaluwe (29 October)

  1. Disruption resolved Last update

    From and to Lage Zwaluwe the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Dordrecht and Lage Zwaluwe there are fewer trains running due to a level crossing failure.
    This will take until approximately 7:45 PM hours.

    Train measures

    • Intercity 2300 Vlissingen - Amsterdam C. is cancelled between Dordrecht and Roosendaal
    • Sprinter 6600 Dordrecht - Nijmegen is cancelled between Dordrecht and Lage Zwaluwe

Location of this disruption

This disruption is around Lage Zwaluwe.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

More about this disruption

Statistics

This disruption started at 7:11 PM on October 29, 2026 and took 1 hour, 48 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights