Engineering works: Amsterdam - Utrecht; Amsterdam - Gouda
Situation
Between Breukelen and Amsterdam Bijlmer ArenA buses are running due to engineering works.
The additional travel time varies per journey.
Period
Between Monday, September 7, 2026 8:15 PM hours and Tuesday, September 8, 2026 2:00 AM hours.
Advice
Passengers between Woerden and Amsterdam Centraal travel via Utrecht Centraal.
The timetable has been modified. You can see the modified timetable on this page.
Use the journey planner to plan your journey. It is usually up-to-date approximately 10 days prior to your travel date.
Location of these engineering works
These engineering works take place between Breukelen and Amsterdam Bijlmer ArenA.
See the disruptions map for a live overview of all disruptions in the Netherlands.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Local buses are running between Breukelen, Abcoude, Amsterdam Holendrecht and Amsterdam Bijlmer ArenA.
- Local buses are running between Breukelen, Abcoude, Amsterdam Holendrecht, Amsterdam Bijlmer ArenA, Duivendrecht, Amsterdam Amstel, Amsterdam Muiderpoort and Amsterdam Centraal.
-
Sprinter
4000
Uitgeest - Rotterdam C.
- is cancelled between Woerden and Amsterdam Centraal
- runs today from/to Woerden and Utrecht Centraal between Woerden and Utrecht Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Monday, September 7, 2026 8:15 PM and Tuesday, September 8, 2026 2:00 AM.