engineering works

Engineering works: Amsterdam - Utrecht

Situation

Between Amsterdam Centraal and Amsterdam Bijlmer ArenA the timetable has been changed due to engineering works.
The extra travel time is about 15 minutes.

Period

In the night from Saturday to Sunday, May 5, 2024 between 1:00 AM and 3:00 AM hours.

Advice

Er rijdt een extra Nachtnet tussen Utrecht Centraal, Amsterdam Bijlmer Arena en Schiphol Airport.

Last update:

Modified timetable

During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:

More about these engineering works

Plan your trip

Plan your trip in advance and use the journey planner.

During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.

Affected lines

The following lines are affected by these engineering works:

Time periods

These engineering works are in effect between Sunday, May 5, 2024 1:00 AM and Sunday, May 5, 2024 3:00 AM.