Logistical limitations: Delft
Current status:
Engineering works are finished.
Situation
From and to Delft the timetable has been changed due to logistical limitations.
Period
In the night from Wednesday to Thursday, May 26, 2022 between 1:15 AM and 5:00 AM hours.
Last update:
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
- Intercity 1400 Rotterdam C. - Leiden C. - Amsterdam C. - Utrecht C. keeps running normally between Den Haag HS and Rotterdam Centraal
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Affected lines
The following lines are affected by these engineering works:
Time periods
These engineering works are in effect between Thursday, May 26, 2022 1:15 AM and Thursday, May 26, 2022 5:00 AM.