Engineering works: Eindhoven - Roermond
Situation
Between Weert and Roermond buses are running due to engineering works.
The extra travel time may be up to 30 minutes.
Period
Between Saturday, November 7, 2020 4:00 AM hours and Monday, November 9, 2020 2:00 AM hours.
Modified timetable
During these engineering works, the timetable has been modified. The following changes have been made to the train schedule:
-
Intercity
800
Weert - Roermond
- is cancelled between Weert and Roermond
- will make an extra stop at Geldrop, Heeze and Maarheeze
-
Intercity
2900
Eindhoven C. - Weert
- will make an extra stop at Geldrop, Heeze and Maarheeze
- is cancelled between Weert and Roermond
- Intercity 3900 Eindhoven C. - Roermond is cancelled between Eindhoven Centraal and Roermond
- Sprinter 6400 Eindhoven C. - Weert is cancelled between Eindhoven Centraal and Weert
- Buses are running between Weert and Roermond.
- Buses are running between Weert, Roermond, Sittard and Maastricht.
- Buses are running between Roermond, Weert and Eindhoven Centraal.
- Buses are running between Weert and Roermond.
- Buses are running between Roermond, Weert and Eindhoven Centraal.
- Buses are running between Weert, Roermond, Sittard and Maastricht.
More about these engineering works
Plan your trip
Plan your trip in advance and use the journey planner.
During your trip, you can stay up-to-date by checking live departures or by using the Rijden de Treinen mobile app for iOS and Android.
Time periods
These engineering works are in effect between Saturday, November 7, 2020 4:00 AM and Monday, November 9, 2020 2:00 AM.