seinstoring

Signal failure: Schiphol - Lelystad; Schiphol Airport - Den Haag (27 August)

  1. Disruption resolved Last update

    Between Schiphol Airport and Lelystad Centrum the train traffic is fully resumed.
    Between Schiphol Airport and Den Haag Centraal the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Schiphol Airport and Lelystad Centrum fewer Sprinter trains are running due to a signal failure.
    Between Schiphol Airport and Den Haag Centraal fewer Sprinter trains are running due to a signal failure.
    This will take until approximately 12:30 AM on Friday, August 28, 2026.

    Train measures

    • Sprinter 4300 Lelystad Centrum - Den Haag C. is cancelled between Den Haag Centraal and Lelystad Centrum

Location of this disruption

This disruption is between Schiphol Airport and Lelystad Centrum and between Schiphol Airport and Den Haag Centraal.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

More about this disruption

Statistics

This disruption started at 4:54 PM on August 27, 2026 and took 4 hours, 35 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights