seinstoring

Signal failure: Heerlen - Maastricht Randwyck (5 October 2025)

  1. Disruption resolved Last update

    Between Valkenburg and Maastricht Randwyck the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Valkenburg and Maastricht Randwyck the train schedule is modified due to a signal failure.
    This will take until approximately 12:45 PM hours.

    Advice

    The Stoptrein does not stop in Maastricht.

    Train measures

    • Sneltrein 18900 Luik Guillemins - Aken is cancelled between Heerlen and Maastricht
    • Stoptrein 32000 Kerkrade Centrum - Randwyck with an extra change at Maastricht between Heerlen and Maastricht Randwyck

Location of this disruption

This disruption is between Valkenburg and Maastricht Randwyck.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

More about this disruption

Statistics

This disruption started at 10:20 AM on October 5, 2025 and took 3 hours, 10 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and NMBS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights