defecte bovenleiding

Damaged overhead wires: 's-Hertogenbosch - Eindhoven (14 April)

  1. Disruption resolved Last update

    Between Boxtel and Eindhoven Centraal the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Boxtel and Eindhoven Centraal fewer Sprinter trains are running due to damaged overhead wires.
    The extra travel time may be up to 15 minutes.
    This will take until approximately 3:45 PM hours.

    Train measures

    • Sprinter 4400 Boxtel - Deurne is cancelled between Boxtel and Deurne

Location of this disruption

This disruption is between Boxtel and Eindhoven Centraal.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 1:42 PM on April 14, 2025 and took 1 hour, 2 minutes in total.

For statistics, this disruption is caused due to damaged overhead wires.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights