sein- en overwegstoring

Signal and level crossing failure: Roosendaal - Vlissingen (2 March)

  1. Disruption resolved Last update

    Between Bergen op Zoom and Goes the train traffic is fully resumed.

  2. Update

    Between Bergen op Zoom and Goes there is a service disruption due to a signalling and level crossing failure.
    This will take until approximately 3:00 PM hours.

  3. Disruption reported

    Between Roosendaal and Vlissingen there is a service disruption due to a signalling and level crossing failure.
    This will take until approximately 3:00 PM hours.

Location of this disruption

This disruption is between Bergen op Zoom and Goes.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 1:26 PM on March 2, 2025 and took 9 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights