sein- en overwegstoring

Signal and level crossing failure: Breukelen - Utrecht - Veenendaal (30 November 2024)

  1. Disruption resolved Last update

    Between Utrecht Centraal and Utrecht Vaartsche Rijn the train traffic is fully resumed.
    Between Utrecht Centraal and Utrecht Zuilen the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Utrecht Centraal and Utrecht Vaartsche Rijn fewer Sprinter trains are running due to a signalling and points failure.
    Between Utrecht Centraal and Utrecht Zuilen no Sprinters are running due to a signalling and points failure.
    The extra travel time may be up to 45 minutes.
    This will take until approximately 12:30 PM hours.

    Train measures

    • Sprinter 7300 Rhenen - Breukelen does not call at Utrecht Zuilen and Utrecht Vaartsche Rijn

Location of this disruption

This disruption is between Utrecht Centraal and Utrecht Vaartsche Rijn and between Utrecht Centraal and Utrecht Zuilen.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 11:14 AM on November 30, 2024 and took 1 hour, 3 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Operators

This disruption affects trains operated by NS and NS International.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights