uitloop werkzaamheden

Over-running engineering works: Den Haag-Rotterdam; Den Haag-Rotterdam (26 July 2024)

  1. Disruption resolved Last update

    Between Den Haag HS and Delft the train traffic is fully resumed.
    Between Delft and Schiedam Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Den Haag Centraal and Delft no trains are running due to over-running engineering works.
    Between Delft and Schiedam Centrum buses are running instead of trains due to over-running engineering works.
    The extra travel time is between 30 and 45 minutes.
    This will take until approximately 4:00 AM on Wednesday, July 31, 2024.

    Advice

    Use the HTM tram around Den Haag between Den Haag HS and Delft.
    Use the HTM tram around Den Haag between Den Haag Ypenburg and Delft.
    Use the city bus lines between Den Haag HS and Den Haag Moerwijk.
    Use the city bus lines between Den Haag HS and Rijswijk.
    Local buses are running between Delft and Schiedam Centrum.
    Local buses are running between Delft and Delft Campus.
    Avoid crowds and long waiting times, and travel via Gouda, or postpone your journey. Plan your trip accordingly.

    Train measures

    • Intercity direct 1100-1111 Den Haag C./Rotterdam C. - Rotterdam C./Den Haag C. is cancelled between Den Haag Centraal and Rotterdam Centraal
    • Intercity 2200 Amsterdam C./Vlissingen - Vlissingen/Amsterdam C. is cancelled between Den Haag HS and Rotterdam Centraal
    • Sprinter 5100 Dordrecht/Den Haag C. - Den Haag C./Dordrecht is cancelled between Den Haag Centraal and Rotterdam Centraal
    • Intercity 703700 Den Haag HS/Dordrecht - Dordrecht/Den Haag HS is cancelled between Den Haag HS and Dordrecht

Location of this disruption

This disruption is between Den Haag HS and Delft and between Delft and Schiedam Centrum.

Map of the location of this disruption

See the disruptions map for a live overview of all disruptions in the Netherlands.

More about this disruption

Statistics

This disruption started at 10:55 PM on July 26, 2024 and took 2 days, 13 hours, 53 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights