Signal and level crossing failure: Arnhem-Doetinchem (16 January 2024)
- 
            
            
        
        
    
Disruption resolved Last update
Between Arnhem Centraal and Zevenaar the train traffic is fully resumed.
 - Show complete timeline…
 - 
                
                
            
            
    
Disruption reported
Between Arnhem Velperpoort and Zevenaar there are fewer local trains running due to a signalling and level crossing failure.
The extra travel time may be up to 30 minutes.
This will take at least until 9:00 AM hours. 
Location of this disruption
This disruption is between Arnhem Centraal and Zevenaar.
See the disruptions map for a live overview of all disruptions in the Netherlands.
More about this disruption
Statistics
This disruption started at 7:13 AM on January 16, 2024 and took 4 hours, 1 minute in total.
For statistics, this disruption is caused due to a signal and level crossing failure.
Affected lines
The following lines are affected by this disruption:
Operators
This disruption affects trains operated by NS International, Arriva, Breng, Deutsche Bahn and Vias.
Got delayed due to this disruption? You may be reimbursed.