sein- en overwegstoring

Signal and level crossing failure: Arnhem-Doetinchem (16 January 2024)

  1. Disruption resolved Last update

    Between Arnhem Centraal and Zevenaar the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Arnhem Velperpoort and Zevenaar there are fewer local trains running due to a signalling and level crossing failure.
    The extra travel time may be up to 30 minutes.
    This will take at least until 9:00 AM hours.

Location of this disruption

This disruption is between Arnhem Centraal and Zevenaar.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 7:13 AM on January 16, 2024 and took 4 hours, 1 minute in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Operators

This disruption affects trains operated by NS International, Arriva, Breng, Deutsche Bahn and Vias.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights