seinstoring

Signal failure: Utrecht-Arnhem (10 July 2023)

  1. Disruption resolved Last update

    Between Ede-Wageningen and Arnhem Centraal the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Ede-Wageningen and Wolfheze far fewer trains are running due to a signal failure.
    It is not known yet how long this will take.

    Advice

    Passengers between Nijmegen and Utrecht Centraal travel via 's-Hertogenbosch. The extra travel time is up to 15 minutes.

Location of this disruption

This disruption is between Ede-Wageningen and Arnhem Centraal.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 1:55 PM on July 10, 2023 and took 3 hours, 50 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights