sein- en overwegstoring

Signal and level crossing failure: Amersfoort-Ede-Wageningen (20 May 2022)

  1. Disruption resolved Last update

    Between Amersfoort Centraal and Ede-Wageningen the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Amersfoort Centraal and Ede-Wageningen trains are crowded and travel times may be longer due to a signal and level crossing failure.
    This will take until approximately 7:00 PM hours.

Location of this disruption

This disruption is between Amersfoort Centraal and Ede-Wageningen.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 4:06 PM on May 20, 2022 and took 1 hour, 55 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Connexxion.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights