defect spoor

Defective railway track: Utrecht-Rhenen (14 May 2021)

  1. Disruption resolved Last update

    Between Driebergen-Zeist and Veenendaal Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Driebergen-Zeist and Veenendaal Centrum no trains are running due to a defective railway track.
    The extra travel time is more than 60 minutes.
    This will take until approximately 2:00 AM on Saturday, May 15, 2021.

Location of this disruption

This disruption is between Driebergen-Zeist and Veenendaal Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 4:30 PM on May 14, 2021 and took 1 day, 9 hours, 30 minutes in total.

For statistics, this disruption is caused due to a defective railway track.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights