Disruption cause: defective railway track

This page shows more information about this disruption cause.

This disruption cause has been categorized under Infrastructure.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Amersfoort - Schiphol Airport
    13 disruptions • duration: 3 days, 5 hours
  2. Dordrecht - Rotterdam Centraal
    10 disruptions • duration: 2 days, 5 hours
  3. Lelystad Centrum - Schiphol Airport
    8 disruptions • duration: 2 days, 6 hours
  4. Schiphol Airport - Utrecht Centraal
    8 disruptions • duration: 2 days, 4 hours
  5. Groningen - Zwolle
    8 disruptions • duration: 2 days, 3 hours

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between November 1, 2020 and October 31, 2022, Rijden de Treinen has reported 134 disruptions caused due to a defective railway track. This is an average of 0 disruptions per day.

The average duration for this cause is 6 hours, 52 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to a defective railway track and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.