defecte bovenleiding

Damaged overhead wires: Utrecht-Leiden (26 April 2021)

  1. Disruption resolved Last update

    Between Bodegraven and Alphen a/d Rijn the train traffic is fully resumed.

  2. Delays decreasing

    Between Bodegraven and Alphen a/d Rijn the restrictions are resolved.
    Delays are decreasing.
    Service is normal around 5:45 AM hours.

    Train measures

    • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
  3. Update

    Between Bodegraven and Alphen a/d Rijn no trains are running due to damaged overhead wires.
    This will take until approximately 7:15 AM hours.

    Train measures

    • Intercity 8800 Leiden C. - Utrecht C. is cancelled between Alphen a/d Rijn and Bodegraven
  4. Disruption

    Between Bodegraven and Alphen a/d Rijn no trains are running due to damaged overhead wires.
    This will take until approximately 7:15 AM hours.

More about this disruption

Statistics

This disruption started at 4:51 AM on April 26, 2021 and took 46 minutes in total.

For statistics, this disruption is caused due to damaged overhead wires.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights