defecte bovenleiding

Damaged overhead wires: Utrecht-Veenendaal (11 March 2021)

  1. Disruption resolved Last update

    Between Driebergen-Zeist and Veenendaal Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Driebergen-Zeist and Veenendaal Centrum no trains are running due to damaged overhead wires.
    The extra travel time is more than 60 minutes.
    This will take until approximately 12:30 PM hours.

Location of this disruption

This disruption is between Driebergen-Zeist and Veenendaal Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 8:25 AM on March 11, 2021 and took 13 hours, 35 minutes in total.

For statistics, this disruption is caused due to damaged overhead wires.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights