seinstoring

Signal failure: Rotterdam-Dordrecht (14 August 2020)

  1. Disruption resolved Last update

    Between Rotterdam Centraal and Dordrecht fewer intercities are running due to a signal failure.
    The extra travel time may be up to 15 minutes.

    Advice

    Local buses are running between Delft Campus and Schiedam Centrum.

    Train measures

    • Intercity 1100 Den Haag C. - Rotterdam C. - Breda is cancelled between Den Haag Centraal and Rotterdam Centraal
    • Intercity 2200 Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen keeps running normally between Amsterdam Centraal and Vlissingen
    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Den Haag HS and Dordrecht
    • Sprinter 5000 Den Haag C. - Rotterdam C. - Dordrecht is cancelled between Den Haag HS and Schiedam Centrum
    • Sprinter 5100 Den Haag C. - Rotterdam C. - Breda is cancelled between Den Haag Centraal and Dordrecht

Location of this disruption

This disruption is between Rotterdam Centraal and Dordrecht.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 11:33 AM on August 14, 2020 and took 0 seconds in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights