seinstoring

Signal failure: Arnhem-Doetinchem (23 July 2019)

  1. Disruption resolved Last update

    Between Zevenaar and Doetinchem the train traffic is fully resumed.

    Train measures

    • Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Doetinchem and Zevenaar
    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Wehl and Arnhem Centraal
  2. Show complete timeline…
  3. Disruption reported

    Between Zevenaar and Doetinchem no trains are running due to a signal failure.
    The extra travel time is more than 60 minutes.
    This will take until approximately 1:00 PM hours.

Location of this disruption

This disruption is between Zevenaar and Doetinchem.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 12:07 PM on July 23, 2019 and took 39 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights