seinstoring

Signal failure: Rotterdam-Breda (HSL); Amsterdam-Schiphol-Rotterdam (HSL) (6 May 2019)

  1. Disruption resolved Last update

    Between Schiphol Airport and Rotterdam Centraal the restrictions are resolved.
    Between Rotterdam Centraal and Breda the restrictions are resolved.

  2. Show complete timeline…
  3. Disruption reported

    Between Schiphol Airport and Rotterdam Centraal no Intercity Direct trains are running due to a signal failure.
    Between Rotterdam Centraal and Breda no trains are running on the high-speed line due to a signal failure.
    This will take until at least 5:30 PM hours.

    Advice

    Use the metro of Rotterdam between Rotterdam Centraal and Den Haag Centraal.
    Use the HTM tram in The Hague, use line 3 or line 4 between Den Haag Centraal and Delft.

    Train measures

    • Intercity direct 900 Amsterdam C. - Schiphol Airport - Rotterdam C. - Breda is cancelled between Amsterdam Centraal and Breda
    • Intercity direct 1000 Amsterdam C. - Schiphol Airport - Rotterdam C. is cancelled between Amsterdam Centraal and Rotterdam Centraal
    • Intercity 1100 Den Haag C. - Rotterdam C. - Breda is cancelled between Den Haag Centraal and Breda
    • Intercity 2200 Amsterdam C. - Haarlem - Rotterdam C. - Vlissingen is cancelled between Den Haag HS and Dordrecht
    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Den Haag HS and Dordrecht
    • Sprinter 5000 Den Haag C. - Rotterdam C. - Dordrecht is cancelled between Schiedam Centrum and Rotterdam Zuid
    • Sprinter 5100 Den Haag C. - Rotterdam C. - Breda is cancelled between Schiedam Centrum and Rotterdam Zuid
    • Sprinter 7700 Rotterdam C. - Goverwelle is cancelled between Gouda Goverwelle and Rotterdam Centraal

Location of this disruption

This disruption is between Schiphol Airport and Rotterdam Centraal and between Rotterdam Centraal and Breda.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 5:00 PM on May 6, 2019 and took 1 hour, 58 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS, NS International, Thalys and Eurostar.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights