seinstoring

Signal failure: Arnhem-Winterswijk (22 March 2019)

  1. Disruption resolved Last update

    Between Zevenaar and Wehl the restrictions are resolved.

  2. Show complete timeline…
  3. Disruption reported

    Between Zevenaar and Wehl no trains are running due to a signal failure.
    This will take until approximately 7:30 AM hours.

    Train measures

    • Stoptrein 30700 Arnhem C. - Doetinchem is cancelled between Arnhem Centraal and Doetinchem
    • Stoptrein 30900 Arnhem C. - Winterswijk runs only once per hour between Arnhem Centraal and Zevenaar
  4. Update

    Between Zevenaar and Wehl there are fewer trains running due to a signal failure.
    This will take until approximately 7:30 AM hours.

Location of this disruption

This disruption is between Zevenaar and Wehl.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 5:24 AM on March 22, 2019 and took 1 hour, 49 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights