defecte bovenleiding

Damaged overhead wires: Lelystad-Zwolle (1 August 2018)

  1. Disruption resolved Last update

    Between Lelystad Centrum and Zwolle the train traffic is fully resumed.

  2. Update

    Between Lelystad Centrum and Zwolle no trains are running due to damaged overhead wires.
    Updates will follow as more information becomes available.

  3. Disruption reported

    Between Dronten and Zwolle no trains are running due to damaged overhead wires.
    Updates will follow as more information becomes available.

Location of this disruption

This disruption is between Lelystad Centrum and Zwolle.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 3:56 PM on August 1, 2018 and took 6 minutes in total.

For statistics, this disruption is caused due to damaged overhead wires.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights