overwegstoring

Level crossing failure: Dordrecht-Geldermalsen (12 June 2018)

  1. Disruption resolved Last update

    Between Gorinchem and Leerdam the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Gorinchem and Leerdam no trains are running due to a level crossing failure.
    This will take until approximately 1:30 PM hours.

    Train measures

    • Stoptrein 36700 Dordrecht - Gorinchem - Geldermalsen is cancelled between Gorinchem and Leerdam
    • Stoptrein 36800 Gorinchem - Dordrecht is cancelled between Gorinchem and Dordrecht

Location of this disruption

This disruption is between Gorinchem and Leerdam.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 12:27 PM on June 12, 2018 and took 1 hour, 54 minutes in total.

For statistics, this disruption is caused due to a level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights