Level crossing failure: Amersfoort-Barneveld (15 February 2018)
-
Disruption resolved Last update
Between Amersfoort and Barneveld Zuid the train traffic is fully resumed.
-
Update
Between Amersfoort and Barneveld Zuid there are fewer trains running due to a level crossing failure.
The extra travel time is about 15 minutes.
Service is normal around 8:00 PM hours.Train measures
- Stoptrein 31400 Amersfoort - Barneveld Zuid is cancelled between Barneveld Centrum and Barneveld Zuid
-
Update
Between Barneveld Centrum and Barneveld Zuid there are fewer trains running due to a level crossing failure.
The extra travel time is about 15 minutes.
Service is normal around 8:00 PM hours.Train measures
- Stoptrein 31400 Amersfoort - Barneveld Zuid is cancelled between Barneveld Centrum and Barneveld Zuid
-
Update
Between Barneveld Centrum and Barneveld Zuid there are fewer trains running due to a level crossing failure.
The extra travel time is about 15 minutes.
Service is normal around 8:00 PM hours. -
Update
Between Barneveld Centrum and Barneveld Zuid there are delays and fewer trains are running due to an object on the railway track.
Service is normal around 6:30 PM hours. -
Disruption
Between Barneveld Centrum and Barneveld Zuid there are delays and fewer trains are running due to an object on the railway track.
It is not known yet how long this will take.
More about this disruption
Statistics
This disruption started at 5:48 PM on February 15, 2018 and took 2 hours, 3 minutes in total.
For statistics, this disruption is caused due to a level crossing failure.
Operators
This disruption affects trains operated by Connexxion.
Got delayed due to this disruption? You may be reimbursed.