seinstoring

Signal failure: Arnhem-Winterswijk (23 November 2017)

  1. Disruption resolved Last update

    Between Doetinchem and Winterswijk the train traffic is fully resumed.

    Advice

    Local buses are running between Doetinchem and Winterswijk.

    Train measures

    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
  2. Show complete timeline…
  3. Disruption reported

    Between Winterswijk and Zevenaar no trains are running due to a signal failure.
    This will take the rest of the day.

Location of this disruption

This disruption is between Doetinchem and Winterswijk.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 10:16 PM on November 23, 2017 and took 3 hours, 24 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights