A new timetable will be introduced on Sunday, December 9. More information about the 2019 timetable

Disruption Breukelen-Utrecht-Veenendaal

Slippery railway tracks
This disruption is resolved.

Current travel advice

Between Breukelen and Utrecht Centraal the train traffic is fully resumed.

Nov 20, 2017 7:07 PM

Earlier messages

Between Breukelen and Utrecht Centraal there are fewer trains running due to slippery railway tracks.
The extra travel time may be up to 15 minutes.
Service is normal around 7:00 PM hours.

Train measures

  • Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Breukelen and Utrecht Centraal
Nov 20, 2017 3:52 PM

Between Breukelen and Utrecht Centraal there are fewer trains running due to slippery railway tracks.
The extra travel time may be up to 15 minutes.
This will take until at least 5:45 PM hours.

Train measures

  • Sprinter 7300 Veenendaal C. - Utrecht C. - Breukelen is cancelled between Breukelen and Utrecht Centraal
Nov 20, 2017 3:34 PM

Between Breukelen and Utrecht Centraal there are fewer trains running due to slippery railway tracks.
The extra travel time may be up to 15 minutes.
This will take until at least 5:45 PM hours.

Nov 20, 2017 3:32 PM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Information

This disruption started at 3:32 PM on November 20, 2017 and took 3 hours, 35 minutes in total.

For statistics, this disruption is caused due to slippery railway tracks.