Disruption cause: slippery railway tracks

This page shows more information about this disruption cause.

This disruption cause has been categorized under Weather influences.

Most affected lines

List of the railway lines which are most often affected by this cause.

  1. Amsterdam Centraal - Utrecht Centraal
    37 disruptions • duration: 3 days, 20 hours
  2. Schiphol Airport - Utrecht Centraal
    37 disruptions • duration: 3 days, 20 hours
  3. Rhenen - Utrecht Centraal
    9 disruptions • duration: 21 hours, 37 minutes
  4. Groningen - Zwolle
    3 disruptions • duration: 4 hours, 45 minutes
  5. Maastricht - Maastricht Randwyck
    3 disruptions • duration: 3 hours, 51 minutes

One disruption often impacts multiple railway lines. In those cases, the same disruption is counted for each affected line.

Statistics

Statistics for this cause are calculated over the past 24 months.

Between April 1, 2017 and March 31, 2019, Rijden de Treinen has reported 47 disruptions caused due to slippery railway tracks. This is an average of 0 disruptions per day.

The average duration for this cause is 2 hours, 20 minutes.

Number of disruptions and total duration

This graphs shows the number of disruptions which are caused due to slippery railway tracks and the total duration of these disruptions (measured in hours).

Disruptions per weekday

This graphs shows the number of disruptions per day of the week.