sein- en overwegstoring

Signal and level crossing failure: Arnhem-Doetinchem (19 October 2017)

  1. Disruption resolved Last update

    Between Westervoort and Zevenaar the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Westervoort and Zevenaar there are delays and fewer trains are running due to a signal and level crossing failure.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Westervoort and Zevenaar.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 11:36 PM on October 19, 2017 and took 48 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Operators

This disruption affects trains operated by NS International, Arriva, Breng, Deutsche Bahn and Abellio.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights