A new timetable will be introduced on Sunday, December 9. More information about the 2018 timetable

Disruption Eindhoven-Roermond

Over-running engineering works
This disruption is resolved.

Current travel advice

Between Weert and Roermond the train traffic is fully resumed.

Oct 12, 2017 6:22 AM

Earlier messages

Between Weert and Roermond there is a service disruption due to over-running engineering works.
Updates will follow as more information becomes available.

Oct 12, 2017 6:13 AM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Information

This disruption started at 6:13 AM on October 12, 2017 and took 9 minutes in total.

For statistics, this disruption is caused due to over-running engineering works.