sein- en overwegstoring

Signal and level crossing failure: Heerlen-Kerkrade; Heerlen-Herzogenrath (19 September 2017)

  1. Disruption resolved Last update

    Between Heerlen and Landgraaf the train traffic is fully resumed.
    Between Heerlen and Herzogenrath the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Heerlen and Landgraaf no trains are running due to a signal failure.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Heerlen and Landgraaf and between Heerlen and Herzogenrath.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 2:14 PM on September 19, 2017 and took 2 hours, 15 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS, Arriva and Deutsche Bahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights