A new timetable will be introduced on Sunday, December 9. More information about the 2018 timetable

Disruption Heerlen-Kerkrade

Signal failure
This disruption is resolved.

Current travel advice

Between Landgraaf and Kerkrade Centrum the train traffic is fully resumed.

Aug 26, 2017 2:37 PM

Earlier messages

Between Landgraaf and Kerkrade Centrum the restrictions are resolved.
Delays are diminishing.
Service is normal around 2:45 PM hours.

Aug 26, 2017 2:26 PM

Between Landgraaf and Kerkrade Centrum there are no trains running due to a signal failure.
It is not known yet how long this will take.

Aug 26, 2017 1:57 PM

Between Heerlen and Kerkrade Centrum there are no trains running due to a signal failure.
It is not known yet how long this will take.

Aug 26, 2017 11:18 AM

Between Heerlen and Kerkrade Centrum there are no trains running due to a signal failure.
It is not known yet how long this will take.

Train measures

  • Stoptrein 20300 Heerlen - Herzogenrath is cancelled between Heerlen and Herzogenrath
Aug 26, 2017 11:18 AM

Between Heerlen and Kerkrade Centrum there are no trains running due to a signal failure.
It is not known yet how long this will take.

Train measures

  • Stoptrein 20300 Heerlen - Herzogenrath is cancelled between Heerlen and Herzogenrath
  • Stoptrein 32500 Sittard - Heerlen - Kerkrade C. is cancelled between Heerlen and Landgraaf
Aug 26, 2017 11:12 AM

Between Heerlen and Landgraaf there are no trains running due to a signal failure.
It is not known yet how long this will take.

Train measures

  • Stoptrein 20300 Heerlen - Herzogenrath is cancelled between Heerlen and Herzogenrath
  • Stoptrein 32500 Sittard - Heerlen - Kerkrade C. is cancelled between Heerlen and Landgraaf
Aug 26, 2017 11:03 AM

Between Heerlen and Landgraaf there are no trains running due to a signal failure.
It is not known yet how long this will take.

Aug 26, 2017 10:56 AM

Between Heerlen and Landgraaf there is a service disruption due to a signal failure.
Updates will follow as more information becomes available.

Aug 26, 2017 10:52 AM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Information

This disruption started at 10:52 AM on August 26, 2017 and took 3 hours, 45 minutes in total.

For statistics, this disruption is caused due to a signal failure.