seinstoring

Signal failure: Heerlen-Kerkrade (26 August 2017)

  1. Disruption resolved Last update

    Between Landgraaf and Kerkrade Centrum the train traffic is fully resumed.

  2. Delays decreasing

    Between Landgraaf and Kerkrade Centrum the restrictions are resolved.
    Delays are diminishing.
    Service is normal around 2:45 PM hours.

  3. Update

    Between Landgraaf and Kerkrade Centrum there are no trains running due to a signal failure.
    It is not known yet how long this will take.

  4. Update

    Between Heerlen and Kerkrade Centrum there are no trains running due to a signal failure.
    It is not known yet how long this will take.

  5. Update

    Between Heerlen and Kerkrade Centrum there are no trains running due to a signal failure.
    It is not known yet how long this will take.

    Train measures

    • Stoptrein 20300 Heerlen - Herzogenrath is cancelled between Heerlen and Herzogenrath
  6. Update

    Between Heerlen and Kerkrade Centrum there are no trains running due to a signal failure.
    It is not known yet how long this will take.

    Train measures

    • Stoptrein 20300 Heerlen - Herzogenrath is cancelled between Heerlen and Herzogenrath
    • Stoptrein 32500 Sittard - Heerlen - Kerkrade C. is cancelled between Heerlen and Landgraaf
  7. Update

    Between Heerlen and Landgraaf there are no trains running due to a signal failure.
    It is not known yet how long this will take.

    Train measures

    • Stoptrein 20300 Heerlen - Herzogenrath is cancelled between Heerlen and Herzogenrath
    • Stoptrein 32500 Sittard - Heerlen - Kerkrade C. is cancelled between Heerlen and Landgraaf
  8. Update

    Between Heerlen and Landgraaf there are no trains running due to a signal failure.
    It is not known yet how long this will take.

  9. Disruption

    Between Heerlen and Landgraaf there is a service disruption due to a signal failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 10:52 AM on August 26, 2017 and took 3 hours, 45 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights