meerdere verstoringen

Multiple disruptions: Dordrecht-Breda; Dordrecht-Roosendaal (12 August 2017)

  1. Disruption resolved Last update

    Between Dordrecht and Breda the train traffic is fully resumed.
    Between Dordrecht and Roosendaal the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Dordrecht and Lage Zwaluwe far fewer trains are running due to a signal failure.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Dordrecht and Breda and between Dordrecht and Roosendaal.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 7:31 AM on August 12, 2017 and took 11 hours, 58 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights