Signal and level crossing failure: Dordrecht-Geldermalsen (3 August 2017)
-
Disruption resolved Last update
Between Gorinchem and Leerdam the train traffic is fully resumed.
- Show complete timeline…
-
Disruption reported
Between Gorinchem and Leerdam no trains are running due to a signal and level crossing failure.
It is not known yet how long this will take.Train measures
- Stoptrein 36700 Dordrecht - Gorinchem - Geldermalsen is cancelled between Gorinchem and Leerdam
-
Update
Between Gorinchem and Leerdam no trains are running due to a signal and level crossing failure.
It is not known yet how long this will take.
Location of this disruption
More about this disruption
Statistics
This disruption started at 5:34 AM on August 3, 2017 and took 8 hours, 49 minutes in total.
For statistics, this disruption is caused due to a signal and level crossing failure.
Operators
This disruption affects trains operated by Arriva.
Got delayed due to this disruption? You may be reimbursed.