storing bediening seinen

Problems with the signalling system: Heerlen Roermond Maastricht (19 July 2017)

  1. Disruption resolved Last update

    From and to Heerlen the train traffic is fully resumed.
    From and to Roermond the train traffic is fully resumed.
    From and to Maastricht the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    From and to Maastricht there are delays and fewer trains are running due to problems with the signalling system.
    From and to Heerlen there are delays and fewer trains are running due to problems with the signalling system.
    From and to Roermond there are delays and fewer trains are running due to problems with the signalling system.
    It is not known yet how long this will take.

Location of this disruption

This disruption is around Heerlen and around Roermond and around Maastricht.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 8:27 AM on July 19, 2017 and took 7 hours, 1 minute in total.

For statistics, this disruption is caused due to problems with the signalling system.

Operators

This disruption affects trains operated by NS, Arriva, NMBS and Deutsche Bahn.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights