seinstoring

Signal failure: Almere-Lelystad (27 June 2017)

  1. Disruption resolved Last update

    Between Almere Centrum and Lelystad Centrum the train traffic is fully resumed.

    Advice

    Passengers between Den Haag Centraal and Zwolle travel via Utrecht Centraal and Amersfoort. The extra travel time is about 30 minutes.
    Passengers between Amsterdam Centraal and Zwolle travel via Amersfoort. The extra travel time is about 30 minutes.
    Passengers between Schiphol Airport and Zwolle travel via Amersfoort. The extra travel time is about 30 minutes.

  2. Show complete timeline…
  3. Disruption reported

    Between Almere Oostvaarders and Lelystad Centrum there is a service disruption due to a signal failure.
    Updates will follow as more information becomes available.

Location of this disruption

This disruption is between Almere Centrum and Lelystad Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 8:38 AM on June 27, 2017 and took 2 hours, 52 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights