Disruption Heerlen-Kerkrade; Heerlen-Herzogenrath

Signal and level crossing failure
This disruption is resolved.

Current travel advice

Between Heerlen and Landgraaf the train traffic is fully resumed.

Jun 22, 2017 2:43 PM

Earlier messages

Between Heerlen and Landgraaf the restrictions are resolved.
Delays are diminishing.
Service is normal around 2:45 PM hours.

Jun 22, 2017 2:31 PM

Between Heerlen and Landgraaf there are no trains running due to a signal and level crossing failure.
The extra travel time is more than 60 minutes.
It is not known yet how long this will take.

Jun 22, 2017 2:10 PM

Between Landgraaf and Kerkrade Centrum there are no trains running due to a signal and level crossing failure.
The extra travel time is more than 60 minutes.
It is not known yet how long this will take.

Jun 22, 2017 2:05 PM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS, Arriva and Deutsche Bahn.

Information

This disruption started at 2:05 PM on June 22, 2017 and took 38 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.