Disruption Maastricht-Randwijck

Signal failure
This disruption is resolved.

Current travel advice

Between Maastricht and Maastricht Randwyck the train traffic is fully resumed.

May 28, 2017 7:10 PM

Earlier messages

Between Maastricht and Maastricht Randwyck the restrictions are resolved.
Delays are diminishing.
Service is normal around 6:30 PM hours.

Train measures

  • Sneltrein 32100 Maastricht - Heerlen is cancelled between Maastricht and Maastricht Randwyck
May 28, 2017 6:05 PM

Between Maastricht and Maastricht Randwyck there are fewer trains running due to a signal failure.
The extra travel time may be up to 15 minutes.
It is not known yet how long this will take.

Train measures

  • Sneltrein 32100 Maastricht - Heerlen is cancelled between Maastricht and Maastricht Randwyck
May 28, 2017 2:07 PM

Between Maastricht and Maastricht Randwyck there are fewer trains running due to a signal failure.
The extra travel time may be up to 30 minutes.
It is not known yet how long this will take.

Train measures

  • Sneltrein 32100 Maastricht - Heerlen is cancelled between Maastricht and Maastricht Randwyck
May 28, 2017 1:58 PM

Between Maastricht and Maastricht Randwyck there are fewer trains running due to a signal failure.
The extra travel time may be up to 30 minutes.
It is not known yet how long this will take.

May 28, 2017 1:57 PM

Between Maastricht and Maastricht Randwyck there is a service disruption due to a signal failure.
Updates will follow as more information becomes available.

May 28, 2017 1:52 PM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and NMBS.

Information

This disruption started at 1:52 PM on May 28, 2017 and took 5 hours, 18 minutes in total.

For statistics, this disruption is caused due to a signal failure.