A new timetable will be introduced on Sunday, December 9. More information about the 2019 timetable

Disruption Arnhem-Winterswijk

Signal failure
This disruption is resolved.

Current travel advice

Between Doetinchem and Winterswijk the train traffic is fully resumed.

Advice

Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

May 27, 2017 2:56 PM

Earlier messages

Between Doetinchem and Winterswijk the restrictions are resolved.
Delays are diminishing.
Service is normal around 3:00 PM hours.

Advice

Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

May 27, 2017 2:47 PM

Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
This will take until approximately 3:00 PM hours.

Advice

Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

Train measures

  • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
May 27, 2017 2:45 PM

Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
This will take until approximately 3:30 PM hours.

Advice

Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

Train measures

  • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
May 27, 2017 1:28 PM

Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
This will take until approximately 3:30 PM hours.

Advice

Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. No extra travel time.

Train measures

  • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
May 27, 2017 1:26 PM

Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
It is not known yet how long this will take.

May 27, 2017 12:58 PM

Between Doetinchem and Winterswijk there is a service disruption due to a signal failure.
Updates will follow as more information becomes available.

May 27, 2017 12:45 PM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Information

This disruption started at 12:45 PM on May 27, 2017 and took 2 hours, 11 minutes in total.

For statistics, this disruption is caused due to a signal failure.