seinstoring

Signal failure: Arnhem-Winterswijk (27 May 2017)

  1. Disruption resolved Last update

    Between Doetinchem and Winterswijk the train traffic is fully resumed.

    Advice

    Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

  2. Delays decreasing

    Between Doetinchem and Winterswijk the restrictions are resolved.
    Delays are diminishing.
    Service is normal around 3:00 PM hours.

    Advice

    Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

  3. Update

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    This will take until approximately 3:00 PM hours.

    Advice

    Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

    Train measures

    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
  4. Update

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    This will take until approximately 3:30 PM hours.

    Advice

    Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. The extra travel time is up to 15 minutes.

    Train measures

    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
  5. Update

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    This will take until approximately 3:30 PM hours.

    Advice

    Passengers between Arnhem Centraal and Winterswijk travel via Zutphen. No extra travel time.

    Train measures

    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
  6. Update

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    It is not known yet how long this will take.

  7. Disruption

    Between Doetinchem and Winterswijk there is a service disruption due to a signal failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 12:45 PM on May 27, 2017 and took 2 hours, 11 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights