sein- en overwegstoring

Signal and level crossing failure: Groningen-Roodeschool (30 March 2017)

  1. Disruption resolved Last update

    Between Sauwerd and Warffum the train traffic is fully resumed.

  2. Delays decreasing

    Between Sauwerd and Warffum the restrictions are resolved.
    Delays are diminishing.
    Service is normal around 4:30 PM hours.

  3. Update

    Between Sauwerd and Warffum there are no trains running due to a signal and level crossing failure.
    The extra travel time may be up to 30 minutes.
    This will take until approximately 5:30 PM hours.

    Advice

    Local buses are running between Sauwerd, Winsum, Baflo and Warffum.

    Train measures

    • Stoptrein 37600 Groningen - Roodeschool keeps running normally between Warffum and Roodeschool
    • Stoptrein 37600 Groningen - Roodeschool keeps running normally between Groningen and Sauwerd
  4. Update

    Between Sauwerd and Warffum there are no trains running due to a signal and level crossing failure.
    The extra travel time may be up to 30 minutes.
    This will take until approximately 5:30 PM hours.

    Advice

    Local buses are running between Sauwerd, Winsum, Baflo and Warffum.

  5. Update

    Between Sauwerd and Warffum there are no trains running due to a signal and level crossing failure.
    The extra travel time may be up to 30 minutes.
    It is not known yet how long this will take.

    Advice

    Local buses are running between Sauwerd, Winsum, Baflo and Warffum.

  6. Update

    Between Sauwerd and Warffum there are no trains running due to a signal and level crossing failure.
    The extra travel time is more than 60 minutes.
    It is not known yet how long this will take.

  7. Update

    Between Sauwerd and Roodeschool there are no trains running due to a signal and level crossing failure.
    It is not known yet how long this will take.

  8. Disruption

    Between Sauwerd and Roodeschool there is a service disruption due to a signal and level crossing failure.
    Updates will follow as more information becomes available.

More about this disruption

Statistics

This disruption started at 2:40 PM on March 30, 2017 and took 1 hour, 48 minutes in total.

For statistics, this disruption is caused due to a signal and level crossing failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights