seinstoring

Signal failure: Arnhem-Winterswijk (18 March 2017)

  1. Disruption resolved Last update

    Between Doetinchem and Winterswijk the train traffic is fully resumed.

  2. Delays decreasing

    Between Doetinchem and Winterswijk the restrictions are resolved.
    Delays are diminishing.
    Service is normal around 3:00 PM hours.

  3. Update

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    This will take until approximately 3:30 PM hours.

    Train measures

    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
  4. Update

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    This will take until approximately 4:00 PM hours.

    Train measures

    • Stoptrein 30900 Arnhem C. - Winterswijk is cancelled between Doetinchem and Winterswijk
  5. Disruption

    Between Doetinchem and Winterswijk there are no trains running due to a signal failure.
    It is not known yet how long this will take.

More about this disruption

Statistics

This disruption started at 12:53 PM on March 18, 2017 and took 2 hours, 7 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by Arriva and Breng.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights