seinstoring

Signal failure: Den Haag-Rotterdam; Leiden-Rotterdam (15 March 2017)

  1. Disruption resolved Last update

    Between Den Haag HS and Rotterdam Centraal the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Den Haag HS and Rotterdam Centraal far fewer trains are running due to a signal failure.
    It is not known yet how long this will take.

    Train measures

    • Intercity 1100 Den Haag C. - Rotterdam C. - Breda is cancelled between Den Haag Centraal and Breda
    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Den Haag HS and Dordrecht
    • Sprinter 5000 Den Haag C. - Rotterdam C. - Dordrecht is cancelled between Den Haag Centraal and Dordrecht
    • Intercity 9200 Amsterdam CS - Rotterdam C. - Antwerpen-C. - Brussel Z./Midi is cancelled between Amsterdam Centraal and Rotterdam Centraal

Location of this disruption

This disruption is between Den Haag HS and Rotterdam Centraal.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 5:14 PM on March 15, 2017 and took 6 hours in total.

For statistics, this disruption is caused due to a signal failure.

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights