seinstoring

Signal failure: Almere-Lelystad (15 March 2017)

  1. Disruption resolved Last update

    Between Almere Centrum and Lelystad Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Almere Centrum and Lelystad Centrum there are fewer trains running due to a signal failure.
    This will take until at least 9:15 AM hours.

    Train measures

    • Intercity 2400 Lelystad C. - Schiphol Airport - Rotterdam C. - Dordrecht is cancelled between Leiden Centraal and Lelystad Centrum
    • Sprinter 14600 Amsterdam CS - Lelystad C. - Zwolle is cancelled between Almere Centrum and Lelystad Centrum

Location of this disruption

This disruption is between Almere Centrum and Lelystad Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 7:41 AM on March 15, 2017 and took 1 hour, 47 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights