Disruption Rotterdam-Hoek van Holland

Signal failure
This disruption is resolved.

Current travel advice

Between Rotterdam Centraal and Vlaardingen Centrum the train traffic is fully resumed.

Train measures

  • Sprinter 7100 Rotterdam C. - Vlaardingen C. is cancelled between Rotterdam Centraal and Vlaardingen Centrum
Mar 10, 2017 8:59 AM

Earlier messages

Between Rotterdam Centraal and Vlaardingen Centrum fewer Sprinter trains are running due to a signal failure.
The extra travel time may be up to 15 minutes.
This will take until at least 9:00 AM hours.

Train measures

  • Sprinter 7100 Rotterdam C. - Vlaardingen C. is cancelled between Rotterdam Centraal and Vlaardingen Centrum
Mar 10, 2017 7:39 AM

Between Rotterdam Centraal and Vlaardingen Centrum fewer Sprinter trains are running due to a signal failure.
The extra travel time may be up to 15 minutes.
This will take until at least 9:00 AM hours.

Mar 10, 2017 7:00 AM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS.

Information

This disruption started at 7:00 AM on March 10, 2017 and took 1 hour, 59 minutes in total.

For statistics, this disruption is caused due to a signal failure.