seinstoring

Signal failure: Schiphol-Lelystad; Almere-Lelystad (8 March 2017)

  1. Disruption resolved Last update

    Between Almere Centrum and Lelystad Centrum the train traffic is fully resumed.
    Between Schiphol Airport and Almere Centrum the train traffic is fully resumed.

  2. Show complete timeline…
  3. Disruption reported

    Between Almere Centrum and Lelystad Centrum there are fewer trains running due to a signal failure.
    It is not known yet how long this will take.

Location of this disruption

This disruption is between Almere Centrum and Lelystad Centrum and between Schiphol Airport and Almere Centrum.

Map of the location of this disruption

More about this disruption

Statistics

This disruption started at 6:30 AM on March 8, 2017 and took 2 hours, 29 minutes in total.

For statistics, this disruption is caused due to a signal failure.

Operators

This disruption affects trains operated by NS.

Got delayed due to this disruption? You may be reimbursed.

Refunds and passenger rights