A new timetable will be introduced on Sunday, December 9. More information about the 2019 timetable

Disruption Utrecht-Nijmegen; Utrecht-Rhenen

Unexpected engineering works
This disruption is resolved.

Current travel advice

Between Driebergen-Zeist and Ede-Wageningen the train traffic is fully resumed.
Between Driebergen-Zeist and Veenendaal Centrum the train traffic is fully resumed.

Feb 16, 2017 10:00 AM

Earlier messages

Between Driebergen-Zeist and Ede-Wageningen the restrictions are resolved.
Between Driebergen-Zeist and Veenendaal Centrum the restrictions are resolved.
Delays are diminishing.
Service is normal around 10:00 AM hours.

Feb 16, 2017 9:24 AM

Between Driebergen-Zeist and Ede-Wageningen there are no trains running due to unexpected engineering works.
Between Driebergen-Zeist and Veenendaal Centrum there are no trains running due to unexpected engineering works.
This will take until approximately 10:00 AM hours.

Feb 16, 2017 9:02 AM

Affected lines

The following lines are affected by this disruption:

Operators

This disruption affects trains operated by NS and NS International.

Information

This disruption started at 9:02 AM on February 16, 2017 and took 58 minutes in total.

For statistics, this disruption is caused due to unexpected engineering works.